Vaško M, Daniška V, Rehák I, Bezák P, Ondra F, Zachar M, Krištofová K, Lindskog S (SKI) (2008). An Explorative Study of Cost Calculation of the Isotope Central Building with Emphasis on Definitions of Variables and Tentative Decommissioning Cost Calculation, study, TED/STD/SKI/EN/016/07, January 2008.