Mihók P (MBU), Mršková A (2011). IPPA Deliverable 2.4 – Review of Public Participation in SEA and EIA Procedures in the Nuclear Sector in Slovakia, study, TED/STD/EC/EN/025/11, October 2011.
Mihók P (MBU), Mršková A (2011). IPPA Deliverable 2.4 – Review of Public Participation in SEA and EIA Procedures in the Nuclear Sector in Slovakia, study, TED/STD/EC/EN/025/11, October 2011.